Ollerton roundabout

The scheme at Ollerton roundabout includes:

  • an enlarged conventional roundabout – 5 arms instead of 6
  • increased capacity
  • two circulatory lanes around the roundabout
  • a reduced speed limit on approaches
  • two toucan crossings
  • third party land to be acquired by negotiation and/or compulsory purchase
  • new residential access added at No.1 Forest Side in response to consultation feedback received (not shown in visualisation below)

Visualisation

Ollerton Roundabout CGI Illustration

Ariel view drawing of Ollerton Roundabout

 

Download Ollerton SRO Engineering Drawing [PDF]