[Skip to content]

Nottinghamshire County Council - Proud of our past, ambitious for our future

Recently Determined Applications

All applications where the planning decision has been made in the last 3 months.



New search Back to search

Your search returned the following results (a total of 21). Click on an application number to view its case file.

3/16/00692/CMW
27/04/2016
GRANTED
13/07/2016
Location
Bilsthorpe Landfill Site, Brailwood Road, Bilsthorpe
Proposal
The planning application seeks to vary conditions 5 and 7of planning permission 3/14/01770/CMA for the importation of circa 1.300 cubic metres (2,000 tonnes) of clays and soils to enable the completion of restoration of the landfill site for an additional 12 month period. The application also seeks to retain the wheel wash and weighbridge facilities for a corresponding period.


3/16/00599/CMA
11/03/2016
GRANTED
30/06/2016
Location
Staple Quarry Landfill Site, Grange Lane, Cotham
Proposal
Varying the requirements of Conditions 1 & 2 of Planning Permission 3/14/00896/CMA to extend the timetable for completing the restoration and aftercare planting of Staple Quarry (Gypsum) landfill and Ayers Rock until 31st December 2016


7/2016/0665NCC
09/05/2016
GRANTED
04/07/2016
Location
Westdale Infant School, Digby Avenue, Mapperley
Proposal
Application to retain existing mobile classroom until 31st December 2021


3/16/00944/CMA
14/04/2016
APPROVED
29/06/2016
Location
The Grove Leisure Centre, London Road, Newark
Proposal
Prior Notification of proposed demolition of sports centre, leisure and community centre


07/06/2016
GRANTED
05/07/2016
Location
Richard Bonington Primary School & Nursery, Calverton Road, Arnold
Proposal
Prior Notification of proposed demolition of single storey CLASP nursery teaching block


4/V/2016/0447
07/07/2016
GRANTED
03/08/2016
Location
Kirkby Woodhouse Primary School, Main Road, Kirkby in Ashfield
Proposal
1. Erection of a small conservatory as a lean-to on existing building to be used as a small reading area and storage; 2. Erection of a log cabin type building, along side the school playground to provide a reading area (outdoors) and indoor library space. The building will consist of 3(no) hexagonal interlocked pods.


8/16/01601/CTY
17/06/2016
GRANTED
21/07/2016
Location
Gotham Primary School, Kegworth Road, Gotham
Proposal
Installation of a 230m x 1m tarmac path around the perimeter of the school field, to be used for the children to jog around


2/2016/0337/NT
27/05/2016
GRANTED
06/07/2016
Location
Abbey Primary School, Stuart Avenue, Forest Town, Mansfield
Proposal
Installation of a lean-to aluminium frame canopy. The canopy will be installed above a main door in an area away from the road


4//V/2016/0356
10/05/2016
GRANTED
26/07/2016
Location
Bracken Hill School, Chartwell Road, Kirkby in Ashfield
Proposal
Single storey extension within existing fully enclosed courtyard, comprising dining area, two offices and a store


1/16/00656/CDM
25/04/2016
GRANTED
29/06/2016
Location
Worksop Bus Station, Newcastle Street, Worksop
Proposal
Installation of vertical bar railings at back of footway.


123
Page 1 of 3