Chapter 2 Sustainable Development
M2.1 Sustainable Development Objectives
M2.2 Minerals Sterilisation
Chapter 3 Environmental Protection
M3.1 Information in support of planning applications
M3.2 Planning obligations
M3.3 Visual Intrusion
M3.4 Screening
M3.5 Noise
M3.6 Blasting
M3.7 Dust
M3.8 Water environment
M3.9 Flooding
M3.10 Associated industrial development
M3.11 Removal of associated industrial development
M3.12 Highways safety and protection
M3.13 Vehicular movements
M3.14 Vehicular routeing
M3.15 Bulk transport of minerals
M3.16 Protection of best and most versatile agricultural land
M3.17 Biodiversity
M3.18 Special Areas of Conservation
M3.19 Sites of Special Scientific Interest
M3.20 Regional and local designated sites
M3.21 Protected species
M3.22 Landscape character
M3.23 Mature landscape Areas
M3.24 Archaeology
M3.25 Listed Buildings, Conservation Areas, Historic Battlefields and Historic Parks and Gardens
M3.26 Public Access
M3.27 Cumulative Impact
Chapter 4 Reclamation
M4.1 Phasing
M4.2 Phasing – details required
M4.3 Soil conservation and use of soil making materials
M4.4 Landscape treatment
M4.5 Reclamation with fill – long term schemes
M4.6 Reclamation with inert fill – small scale schemes
M4.7 Interim reclamation schemes
M4.8 Reclamation proposals for existing sites
M4.9 Aftercare
M4.10 After-use – details required and objectives
M4.11 After-use – management and other agreements
M4.12 Agricultural after-use
M4.13 Heathland and acid grassland after-use
M4.14 Reclamation schemes and geological sites
M4.15 Minerals review - submission of proposals
Chapter 5 Mineral Exploration
M5.1 Mineral exploration
M5.2 Deep boreholes in sensitive areas
M5.3 Retention of haul roads and hard standing
Chapter 6 Sand and Gravel
M6.1 Archaeological resource area - South Muskham
M6.2 Sand and gravel landbanks
M6.3 Sand and gravel extraction in unallocated land
M6.4 Attenborough Plant - environmental improvements
M6.5 Hoveringham (Bleasby) allocation
M6.6 Gunthorpe allocation
M6.7 Rampton allocation
M6.8 Sturton le Steeple allocation
M6.9 Lound allocation
M6.10 Misson (Finningley) allocation
M6.11 Newington allocation
M6.12 Misson Grey sand - area of search
Chapter 7 Sherwood Sandstone
M7.1 Sherwood Sandstone landbanks
M7.2 Sherwood Sandstone extraction in unallocated land
M7.3 Rufford Colliery sand quarry allocation
M7.4 Scrooby Top allocation
M7.5 Carlton Forest sand quarry allocation
M7.6 Silica Sand landbank
Chapter 8 Limestone
M8.1 Aggregate limestone provision
M8.2 Non-aggregate limestone provision
Chapter 9 Secondary and Recycled Aggregates
M9.1 Stockpiling of dredgings
M9.2 Re-excavation of tipped dredgings
Chapter 10 Gypsum
M10.1 Underground gypsum mining - surface support
M10.2 Gypsum mining – safeguarded area at Costock
M10.3 Bantycock allocation
Chapter 11 Clay
M11.1 Kirton allocation
M11.2 Dorket Head – future provision
M11.3 New brickworks and clay pits
Chapter 12 Coal
M12.1 Coal development
M12.2 New deep coal mines
M12.3 Colliery spoil disposal
M12.4 Colliery spoil disposal - use of filter presses
M12.5 Colliery spoil disposal - national evaluative framework
M12.6 Reworking of colliery spoil tips
M12.7 Opencast coal constraint areas
M12.8 Opencast coal – incidental mineral extraction
Chapter 13 Oil Coalbed Methane and Mine Gas
M13.1 Oil exploration
M13.2 Oil appraisal
M13.3 Oil Production
M13.4 Coalbed methane extraction
M13.5 Extraction of mine gas
M13.6 Boreholes –conflicts with other underground mineral resources
M13.7 Reclamation of oil and methane sites
Chapter 14 Incidental Mineral extraction and Borrow Pits
M14.1 Incidental mineral extraction
M14.2 Irrigation lagoons
M14.3 Borrow Pits
