Listen to this page using ReadSpeaker

Chapter 2  Sustainable Development

M2.1 Sustainable Development Objectives

M2.2 Minerals Sterilisation

Chapter 3  Environmental Protection

M3.1 Information in support of planning applications

M3.2 Planning obligations

M3.3 Visual Intrusion

M3.4 Screening

M3.5 Noise

M3.6 Blasting

M3.7 Dust

M3.8 Water environment

M3.9 Flooding

M3.10 Associated industrial development

M3.11 Removal of associated industrial development

M3.12 Highways safety and protection

M3.13 Vehicular movements

M3.14 Vehicular routeing

M3.15 Bulk transport of minerals

M3.16 Protection of best and most versatile agricultural land

M3.17 Biodiversity

M3.18 Special Areas of Conservation

M3.19 Sites of Special Scientific Interest

M3.20 Regional and local designated sites

M3.21 Protected species

M3.22 Landscape character

M3.23 Mature landscape Areas

M3.24 Archaeology

M3.25 Listed Buildings, Conservation Areas, Historic Battlefields and Historic Parks and Gardens

M3.26 Public Access

M3.27 Cumulative Impact

Chapter 4  Reclamation

M4.1 Phasing

M4.2 Phasing – details required

M4.3 Soil conservation and use of soil making materials

M4.4 Landscape treatment

M4.5 Reclamation with fill – long term schemes

M4.6 Reclamation with inert fill – small scale schemes

M4.7 Interim reclamation schemes

M4.8 Reclamation proposals for existing sites

M4.9 Aftercare

M4.10 After-use – details required and objectives

M4.11 After-use – management and other agreements

M4.12 Agricultural after-use

M4.13 Heathland and acid grassland after-use

M4.14 Reclamation schemes and geological sites

M4.15 Minerals review - submission of proposals

Chapter 5  Mineral Exploration

M5.1 Mineral exploration

M5.2 Deep boreholes in sensitive areas

M5.3 Retention of haul roads and hard standing

Chapter 6  Sand and Gravel

M6.1 Archaeological resource area - South Muskham

M6.2 Sand and gravel landbanks

M6.3 Sand and gravel extraction in unallocated land

M6.4 Attenborough Plant - environmental improvements

M6.5 Hoveringham (Bleasby) allocation

M6.6 Gunthorpe allocation

M6.7 Rampton allocation

M6.8 Sturton le Steeple allocation

M6.9 Lound allocation

M6.10 Misson (Finningley) allocation

M6.11 Newington allocation

M6.12 Misson Grey sand - area of search

Chapter 7  Sherwood Sandstone

M7.1 Sherwood Sandstone landbanks

M7.2 Sherwood Sandstone extraction in unallocated land

M7.3 Rufford Colliery sand quarry allocation

M7.4 Scrooby Top allocation

M7.5 Carlton Forest sand quarry allocation

M7.6 Silica Sand landbank

Chapter 8  Limestone

M8.1 Aggregate limestone provision

M8.2 Non-aggregate limestone provision

Chapter 9  Secondary and Recycled Aggregates

M9.1 Stockpiling of dredgings

M9.2 Re-excavation of tipped dredgings

Chapter 10  Gypsum

M10.1 Underground gypsum mining - surface support

M10.2 Gypsum mining – safeguarded area at Costock

M10.3 Bantycock allocation

Chapter 11  Clay

M11.1 Kirton allocation

M11.2 Dorket Head – future provision

M11.3 New brickworks and clay pits

Chapter 12  Coal

M12.1 Coal development

M12.2 New deep coal mines

M12.3 Colliery spoil disposal

M12.4 Colliery spoil disposal - use of filter presses

M12.5 Colliery spoil disposal - national evaluative framework

M12.6 Reworking of colliery spoil tips

M12.7 Opencast coal constraint areas

M12.8 Opencast coal – incidental mineral extraction

Chapter 13  Oil Coalbed Methane and Mine Gas

M13.1 Oil exploration

M13.2 Oil appraisal

M13.3 Oil Production

M13.4 Coalbed methane extraction

M13.5 Extraction of mine gas

M13.6 Boreholes –conflicts with other underground mineral resources

M13.7 Reclamation of oil and methane sites

Chapter 14  Incidental Mineral extraction and Borrow Pits

M14.1 Incidental mineral extraction

M14.2 Irrigation lagoons

M14.3 Borrow Pits

How do you rate this information / service?