Below is a list of planning applications which are pending a decision by the Development Control Team at Nottinghamshire County Council, and are no longer open for consultation. To view more information about an application please click the application number.

This information is updated on a daily basis.

<- 1 | 2 | 3 ->
Application No. Site Reference Location Proposal
F/1859 1648/W Cottam Power Station, Outgang Lane, Retford Change of use of existing ash overhang building which would be internally adapted to house a hammer mill bunker, hammer mill and air handling system. Construction of an external lorry offloading ramp and hopper, 2 x 250m3 silos and assoicated pipework between the offloading hopper and silos. Construction of pipework from new biomass processing plant to the existing suction mills
F/1658 1129/M Land To The South West Of Bumblebee Hall Nr. Hodstock, Worksop~~ Temporary Exploratory Borehole (coal bed methane) and Means of Access to a Highway (B6045) - Revised Application Details
F/1836 1130/M Drilling Of An Appraisal Borehole For The Purpose Of Mineral Exploration For A Temporary Period Land to the west of Babworth Home Farm, Sutton Lane, Babworth, Retford
F/1785 8016/M Land Adjacent To A52 Grantham Road, North Of The Road Between Oatfield Lane To The East Private Road Extending Across The A52 Fro Saxondale Road. To drill and test and produce two exploration boreholes for the purpose of extraction of petroleum as determined by Petroleum Exploration and Development Licence PEDL 255 granted to Newton by the DECC.
F/1788 8015/M Land Adjacent To A46, East Of The Road 200m North Of Hardigate Road And 1.4km South Of The A52 Roundabout. To drill and test and produce two new exploration/appraisal boreholes for the purpose of extraction of petroleum as determined by Petroleum Exploration and Development Licence PEDL 255 granted to Newton by the DECC.
NMA/1834 3071/CCD Sherwood Pines Horticultural Unit, Edwinstowe Vary condition 3 of planning permission 3/09/00207/FULR3N, to re-position 2 poly tunnels
F/1831 8043/CCD Toot Hill Comprehensive School, The Banks, Bingham To replace existing high mast floodlighting illuminating the school bus park with new.~Luminaire control and underground armoured services to remain.
F/1825 8012/CCD Tollerton Primary School, Burnside Grove, Tollerton~~ Erection of security fencing and gates and the raising in height of the existing brick pillars
F/1833 7083/CCD Killisick Childrens Centre. Killisick Road, Arnold Single storey extension
FR3/1832 5075/CCD 14 Derby Road, Eastwood New single storey building to provide a permanent dedicated Youth Centre, including associated drainage and mains services, car parking and landscaping works. The scheme will have sustainable features such as rainwater harvesting, solar heating for hot water and photovoltaic cells for electricty generation.
F/1835 3726/W Brunel Drive, Newark Business Park, Newark Construction of a new household waste recycling centre (HWRC)
V/1766 8008/M East Leake Quarry, Rempstone Variation of condition 2 and 30 of planning permission 8/89/0472 to retain the existing processing plant in relation to adjacent sand and gravel extraction at East Leake Quarry
V/1767 8008/M East Leake Quarry, Rempstone Variation of conditions 4 16 and 30 of pp 8/07/02187/CMA to amend method of working
F/1830 4035/CCD Annie Holgate Junior School, Hight Leys Road, Hucknall Replace existing bow topped fence with 2400mm high Pallas security fencing and gate, coloured green (RAL6005)
F/1828 3688/W Sewage Works, Quibells Lane, Newark Erection of three compressor enclosures
F/1826 3695/W Oakwood Fuels Limited, Brailwood Road, Bilsthorpe Change of use of former railway sidings to transfer station for vehicle serving wastes and treatment facility to handle range of materials for recovery/recycling - approved development.~~Application is to extend the time limited for implementation for an additional 3 years( January 2013)
F/1783 3082/CCD Ropewalk Farm, Tolney Lane, Newark Carry out minor alterations to an existing mobile classroom. Erect 2.4M high security fence around the playground and erect a shade sail in the playground
F/1804 1000/CCD Ordsall Primary School,Ordsall Road, Retford Demolition of part of former Infant School and associated outbuildings. Construct new extension to existing nursery building and associated external paving. Construction of infill link and new classroom to former Junior School building and associated external paving. Construction of screening fence to existing kitchen and plantroom. Construction of new footpath within school grounds and additional drop kerbs/markings to facilitate pedestrian movement around the site. Construction of new security fences.
F/1806 7040/CCD Hawthorne Primary School, School Walk, Bestwod Village Erection of classroom/toilets, internal alterations and associated pathways and erect fencing and gates
F/1777 1121/CCD Misterton Youth Centre, High Street, Misterton Carry out internal alterations and modify existing sliding sash windows to fire exit/entrance door, for use as a children's centre. Erect 1.5m bow top fence, level grassed area to provide car parking.
<- 1 | 2 | 3 ->

How do you rate this information / service?