This information is updated on a daily basis.

Application no.: ES/0793
Site reference: 4642/W
Location: Land situated at Bentinck Tip and Void, situated between Park Lane and Salmon Lane, Annesley Woodhouse
Proposal: Reclamation of Bentinck tip and void through the importation of inert and non-hazardous wastes, construction of a 1.6km access road, establishment of composting, screening, crushing and other ancillary facilties, with restoration to landscaped agriculture use~~~~
Date received: 23/10/2006
Valid date: 28/10/2006
Start of Public Consultation: 28/10/2006
Decision: REFUSED
Decision date: 31/03/2010
Case Officer: Jonathan Smith
Case Officer telephone: 0115 9772104
Contact e-mail: development.planning@nottscc.gov.uk
Agent's name: SLR Consulting Limited
Agent's address: Aspect House
Aspect Business Park
Bennerley Road
Bulwell
Nottingham
Applicant's name: Waste Recycling Limited
Applicant's address: 900 Pavillion Drive
Northampton Business Park
Northampton
Attachments: Introduction [PDF]
Cross Sections of Restoration Scheme [PDF]
Design and Access Statement_Bentinck_FINAL [PDF]
Existing Surface Water Drainage System [PDF]
Existing Highway Network [PDF]
Groundwater Vulnerability Map [PDF]
Geological Cross Section [PDF]
Local Hydrology and Hydrogeology [PDF]
Photo Viewpoint Location Plan [PDF]
Phase 1 Habitat Plan - Proposed Access Road [PDF]
Phase 1 Habitat Plan [PDF]
Phase 1 [PDF]
Phase 2 [PDF]
Phase 3 [PDF]
Phase 4 [PDF]
Phase 5 and 6 [PDF]
Phase 7 [PDF]
Phase 8 [PDF]
Phase 9 [PDF]
Phase 10-12 [PDF]
Phasing of Tip Reclamation Works [PDF]
Superseded Protected Sites Plan [PDF]
Superseded Principal Viewpoints 1 and 2 [PDF]
Superseded Principal Viewpoints 3 and 4 [PDF]
Superseded Principal Viewpoints 5 and 6 [PDF]
Superseded Principal Viewpoints 7 and 8 [PDF]
Superseded Proposed Site Configuration [PDF]
Restoration Scheme [PDF]
Regional Geology [PDF]
Superseded Relevant Landscape Designations [PDF]
Superseded Secondary Viewpoint E and F [PDF]
Road Accident Locations [PDF]
Superseded Secondary Viewpoint A and B [PDF]
Superseded Secondary Viewpoint C and D [PDF]
Site Location Plan [PDF]
Flood Risk Assessment (FRA) written statement & appendices [PDF]
FRA flow direction anaylsis [PDF]
FRA pumping station location plan [PDF]
FRA restored site topography [PDF]
FRA proposed site layout & cross sections [PDF]
FRA site location plan [PDF]
FRA current site layout & cross sections [PDF]
The Site [PDF]
The Development Proposals [PDF]
Planning Context [PDF]
Need Alternatives & Sustainability [PDF]
Geology, Ground conditions & Soils [PDF]
Hydrogeology & Hydrolgy [PDF]
Air Quality [PDF]
Amenity [PDF]
Noise [PDF]
Trafffic & Transport [PDF]
Landscape [PDF]
Flora and Fauna [PDF]
Cultural Heritage [PDF]
Land Use [PDF]
Human Beings [PDF]
Non technical summary [PDF]
Superseded Access Road Cross Sections [PDF]
Access Road Landscaping Concept [PDF]
Application Site and Surrounding Area [PDF]
Superseded Basal Landform and Landfill Infrastructure [PDF]
Cover, Preface and Contents [PDF]
Keyfact Sheet & Inspection Points [PDF]
Planning Application Form [PDF]
Flow Direction Analysis [PDF]
Wintering Bird Survey Report (Jan 2008) [PDF]
Drawing 2 - Great Crested Newt Population [PDF]
Great Crested Newts Survey (Jan 2008) [PDF]
Great Crested Newts Survey Appendix 1 (Jan 2008) [PDF]
Phase 1 Habitat Plan (Jan 2008) [PDF]
Drawing 1 - Location of Recorded Reptile (Jan 2008) [PDF]
Reptile Survey Report (Jan 2008) [PDF]
Invertebrate Survey and Assessment (Jan 2008) [PDF]
Assessment of Effects on Adjacent SSSI (Jan 2008) [PDF]
Ecological Mitigation and Monitoring Plan (Jan 2008) [PDF]
Superseded EMP1 Phase 1 Habitat Plan (Jan 2008) [PDF]
EMP2 - Restoration Concept (Jan 2008) [PDF]
Superseded EMP3 - Draft Exclusion Facing (Jan 2008) [PDF]
EMP4 - Northern Mitigation Area (Jan 2008) [PDF]
EMP5 - North Eastern Mitigation Area (Jan 2008) [PDF]
EMP6 - Eastern Mitigation Area (Jan 2008) [PDF]
EMP7 - Southern Mitigation Area (Jan 2008) [PDF]
NCC Consultation Letters (Jan 2008) [PDF]
Revised Development Proposals (Jan 2008) [PDF]
Planning Policy (Jan 2008) [PDF]
Landfill Gas Risk Assessment (Jan 2008) [PDF]
Highways Issues (Jan 2008) [PDF]
Landscape and Visual Assessment (Jan 2008) [PDF]
Drawing BC3-17 (Jan 2008) [PDF]
Drawing BC3-18 (Jan 2008) [PDF]
Superseded Drawing BC11-3 (Jan 2008) [PDF]
Superseded Drawing No BC313A (Jan 2008) [PDF]
Bentinck Schedule 4 Response Final [PDF]
Assessment of Needs and Alternatives [PDF]
Bentinck Tip Committee Report (Jan 2008) [PDF]
Culvert Integrity Report (Jan 2008) [PDF]
EA Schedule 4 Notice (Jan 2008) [PDF]
Geotechnical Modelling Report (Jan 2008) [PDF]
Options Appraisal - Diversion of Cuttail Brooke (Jan 2008) [PDF]
Options Appraisal - Landscape and Visual Impact (Jan 2008) [PDF]
Options Appraisal - Movement of Lanfill Footprint (Jan 2008) [PDF]
Options Appraisal - Realign Cuttail Brook (Jan 2008) [PDF]
Options Appraisal - Tip Area (Jan 2008) [PDF]
Possible Ecological Effects of Alternative Options (Jan 2008) [PDF]
Revised Engineering Specification (Jan 2008) [PDF]
Terry Adams Consultation and Committee Report (Jan 2008) [PDF]
Bat Activity 2001-2007 Revised Drawing 2 [PDF]
Draft Exclusion Fencing Revised EMP3 [PDF]
Full Wintering Bird Survey Report [PDF]
Habitat Plan with Distribution of Great Cresyed Newt Revised EMP1 [PDF]
Key to M1 Off Site Landscaping Works [PDF]
Photo Viewpoint Location Plan [PDF]
Revised Access Cross Sections [PDF]
Revised Basal Landform and Landfill Infrastructure [PDF]
Revised Drawing BC 3-13A [PDF]
Revised Drawing BC 3-13B [PDF]
Revised Emergency Services Access and Maintenance Access Drawing [PDF]
Revised M1 Off Site Landscaping Works Drawing [PDF]
Revised Principal Viewpoints 1 and 2 [PDF]
Revised Principal Viewpoints 3 and 4 [PDF]
Revised Principal Viewpoints 5 and 6 [PDF]
Revised Principal Viewpoints 7 and 8 [PDF]
Revised Proposed Site Configuration [PDF]
Revised Protected Sites Plan [PDF]
Revised Relevant Landscape Designations [PDF]
Revised Secondary Viewpoints A and B [PDF]
Revised Secondary Viewpoints C and D [PDF]
Revised Secondary Viewpoints E and F [PDF]
Response to Consultation (Jan 2008) [PDF]
Drawing No BC13-2 (Jan 2008) [PDF]
Drawing No BC13-3 (Jan 2008) [PDF]
DrawingNo BC13-1 (Jan 2008) [PDF]
Ecology Jan 2008 [PDF]
Botanical Survey and Evaluation Report (Jan 2008) [PDF]
Drawing 1 - Botanical Survey Areas (Jan 2008) [PDF]
Drawing 2 - Location of Major Tufa Spring (Jan 2008) [PDF]
Drawing 3 - Location of Major Orchid Swarm (Jan 2008) [PDF]
Drawing 1 - Water Vole Survey 2007 (Jan 2008) [PDF]
Drawing 2 - Water Vole Survey 2006 (Jan 2008) [PDF]
Drawing 3 - Water Vole Survey 2005 (Jan 2008) [PDF]
Drawing 4 - Water Vole Survey 2004 (Jan 2008) [PDF]
Drawing 5 - Water Vole Survey 2003 (Jan 2008) [PDF]
Drawing 6 - Water Vole Survey 2002 (Jan 2008) [PDF]
Drawing 7 - Water Vole Survey 2001 (Jan 2008) [PDF]
Drawing 8 - Water Vole Survey 1999 (Jan 2008) [PDF]
Water Vole Survey Report (Jan 2008) [PDF]
Bat Survey and Assessment (Jan 2008) [PDF]
Culvert Photos (Jan 2008) [PDF]
Drawing 1 - Phase 1 Habitat Plan and Culvert Location (Jan 2008) [PDF]
Superseded Drawing 2 - Bat Activity 2001 - 2007 (Jan 2008) [PDF]
Badger Activity Survey [PDF]
Breeding Bird Survey 2007 (Jan 2008) [PDF]
Breeding Bird Survey Report (Jan 2008) [PDF]
Revised Secondary Viewpoints X and Y [PDF]
Revised Secondary Viewpoint Z [PDF]
Decision notice [PDF]
How do you rate this information / service?